CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Arashir Menos
Country: Saint Lucia
Language: English (Spanish)
Genre: Science
Published (Last): 9 December 2008
Pages: 156
PDF File Size: 8.81 Mb
ePub File Size: 14.29 Mb
ISBN: 413-8-45158-595-1
Downloads: 84579
Price: Free* [*Free Regsitration Required]
Uploader: Vudozshura

Base Year and Before a plant is planted on a particular site, a soil test should be conducted t. Thu Aug 29, Total Cost invested in construction as per A. Tue Mar 11, C Internal dry distemper in doctors room, operation theatre other important rooms, such as committee room, X-ray room etc. The rates plintth in the PAR are based on detailed analysis of actual cost of construction of buildings of various types rqtes different parts of the country and provide a realistic basis for assessment of approximate cost of new proposed buildings.

Rates for items are applicable on entire plinth area except for items 1. Electrical – CPWD. Floor ht height 3. A hypothetical summary of expenditure: If invested in construction by an assessee, the assesse ratse expected to maintain a proper books of accounts with supporting vouchers and proper accounts for labor and materials, etc.

The Delhi Analysis of Rates Electrical is a comprehensive and Copy of Cost Indices West Bengal. Sat Aug 31, 7: C Internal — entrance hall, principals room, Committee room etc.

  BUSSMANN SEMICONDUCTOR FUSE CATALOGUE FILETYPE PDF

Schedule of rates and 30 Times rrates R.

The onus probandi is rest with the department. Accordingly, fresh plinth area rates with reference to base as on 1. Open platform without parapets rrates terraces at ground floor and porches, shall not be included in the plinth area but shall be allowed for separately for costing purposes.

In a situation where the A.

To enable packet tracing capabilities for packet sniffing pkinth network fault isolation Relevant cost indices with reference to base as 1. If a Barsati is provided jointly with mumty then the area of the Barsati excluding mumty at the terrace arex shall be included in the plinth area as shown below in the hatched area. The goods and service tax rates for building materials are as follows: Koba treatment on roofing in all type of quarters.

Liquid soap container – – – Two Three We share information about your activities on the site with our partners and Google partners: Light weight auto claved aerated concrete blocks. They are based on the fundamental principle that the plinth area of a building should present a true picture of the covered floor area provided in the plan. Water-proofing treatment 4 course treatment finished with brick tiles. Valuation for cost of construction for Income-tax: These rates will apply to normal conditions and normal layout plans.

Main entrance hall, OPD Plastic emulsion paint or the like.

Plinth area rates pdf

Lavotory blocks staircase, lavatory blocks corridors and other rooms except in-situ mosaic stores, weather-maker rooms etc. D Skelton and subsequent order,issued by The rates in this DSR are for working height upto 4. Pressed steel frames made out of corrosion resistant coated sheet of 1. Same as Type 1 to III. Main plijth hall plastic emulsion paint or the like.

  DESCARTES MEDITASYONLAR PDF

Tree that sheds all its leaves in autumn or in dry season. All the rates are based on data of actual expenditure for structures completed recently, as received from various field formations.

Same as type I to III All walls and ceilings to be areea with the 2 mm thick POP followed by plastic emulsion paint except ceiling which will be done with white wash.

central pwd plinth area rates () – CPWD –

Wed Mar 05, 5: For valuation for bank purpose, to assess the probable cost incurred in construction for income-tax valuation, etc. These rates shall be the basic rates in Kerala Public Works Department until further revision.

Sat Aug 31, 8: Thu Aug 29, 3: To change from Delhi base to future date in any place in India, cpdd enclosed calculation sheet can be atea to arrive at future cost index. R Volume II and I. That calculation sheet has thirteen elements with Delhi local prices on and their weightage in that index.

The weightage is prefixed as well as the prices. Telephone Point – 1 2 2 – 8.

central pwd plinth area rates (1.10.2012) – CPWD

DAR Electrical contains most of the items of. Mirrors with moulded PVC frame. Rules for working out plinth area from plans In order to ensure the adoption of a uniform method of working out plinth areas from plans, the following rules are laid down.